Date Processed | NO. | ADOT / COG / MPO | DESCRIPTION | NOTES | Date Approved by the FHWA/FTA | Processed By |
03/18/2011 | 87 | ADOT | New projects and project modifications. | Approved by the State Transportation Board March 18, 2011. | 3/22/2011(FHWA) | Lupe Harriger |
02/18/2011 | 86 | ADOT | Highway Projects. | Approved by State Transportation Board on February 18, 2011. | 3/15/2011(FHWA) | Lupe Harriger |
02/14/2011 | 85 | WACOG | WACOG 2011-2015 TIP Amendment #1. | Approved by Executive Board February 10, 2011. | 2/22/2011(FHWA) | Lupe Harriger |
01/28/2011 | 84 | PAG | TIP Amendment #8. | Approved by PAG Regional Council January 27, 2011. | 2/22/2011(FHWA) | Lupe Harriger |
02/02/2011 | 83 | CAAG | Amendment to the 2011-2017 CAAG TIP; Pinal Co. Hunt Hwy from ROW to Construction; Add Casa Grande SRTS; deleted projects in years 2018 and 2019; Deleted Star Valley Moonlight Dr project; Private and Local projects have been moved to their own category. | Approved by CAAG TTAC November 4, 2010, Management Committee November 18, 2010 and Regional Council January 26, 2011. | 2/22/2011(FHWA) | Charla Glendening |
01/24/2011 | 82 | CYMPO | Add two Transportation Enhancement Grants: SR89 White Spar Bikeway Phase III, $877,489, Gurley St. Pedestrian Enhancements, $395,033, Add one Safe Routes to School Grant: Washington Elementary Infrastructure, $190,659. | Approved by Executive Board January 19, 2011. | 2/22/2011(FHWA) | Charla Glendening |
01/21/2011 | 81 | ADOT | Highway Projects. | Approved by State Transportation Board on January 21, 2011. | 2/22/2011(FHWA) | Lupe Harriger |
01/18/2011 | 80 | MAG | Highway & Transit projects. | Approved by MAG Regional Council Executive Committee January 18, 2011. | 1/19/2011(FHWA) 1/19/2011(FTA) |
Lupe Harriger |
01/18/2011 | 79 | ADOT | ADOT Transit Projects for FY 2011. | 3/17/2011(FTA) | Lupe Harriger | |
12/17/2010 | 78 | ADOT | Four new projects. | Approved by the State Transportation Board December 17, 2010. | 1/13/2011(FHWA) | Lupe Harriger |
12/14/2010 | 77 | FMPO | Transit Table 5 | 12/20/2010(FTA) | Lupe Harriger | |
12/09/2010 | 76 | MAG | Amendment & Administrative modification, Highway & Transit. | Approved by MAG Regional Council December 8, 2010. | 1/13/2011(FHWA) 1/13/2011(FTA) |
Lupe Harriger |
12/09/2010 | 75 | PAG | PAG TIP FY 2011-2015 Amendment #7. | Approved by Regional Council December 9, 2010. | 1/13/2011(FHWA) 1/13/2011(FTA) |
Lupe Harriger |
12/01/2010 | 74 | ADOT | Procurement projects approved by PPAC December 1, 2010. | 1/13/2011(FHWA) | Lupe Harriger | |
11/19/2010 | 73 | ADOT | Various new projects & one deferred project. | Approved by the State Transportation Board November 19, 2010. | 12/7/2010(FHWA) | Lupe Harriger |
11/04/2010 | 72 | PAG | Request to include PAGs FY 11-13 projects from their FY 2011-2015 TIP into the FY 2010-2013 STIP, also to include PAG TIP Amendments #1 thru 6. | Approved by PAG Regional Council on November 3, 2010. | 12/8/2010(FHWA) 12/8/2010(FTA) |
Lupe Harriger |
11/03/2010 | 71 | ADOT | Procurement projects approved by PPAC on November 3, 2010. | 11/24/2010(FHWA) | Lupe Harriger | |
10/29/2010 | 70 | MAG | Miscellaneous Highway & Transit projects. | Approved by Regional Council on October 27, 2010. | 11/24/2010(FHWA) 11/24/2010(FTA) |
Lupe Harriger |
10/18/2010 | 69 | ADOT | One new project approved by the TB 10/15/2010 and 2 previous deferrals. | 11/19/2010(FHWA) | Lupe Harriger | |
10/01/2010 | 68 | PAG | PAG TIP FY 2011-2015, Amendment #5 - Items A thru F. | Approved by Regional Council September 30, 2010. | 11/19/2010(FHWA) | Lupe Harriger |
10/01/2010 | 67 | CAAG | Amendment to add Pinal County Hunt Highway, $500,000 to the high Priority Project section of the TIP (earmark funds). | Approved by CAAG Regional Council 9/22/2010, CAAG Management Committee 9/9/2010 and CAAG TTAC on 9/2/2010. | 11/19/2010(FHWA) | Charla Glendening |
09/16/2010 | 66 | ADOT | New projects & project modifications. | Projects approved by the State Transportation Board September 16, 2010. | 9/22/2010(FHWA) | Lupe Harriger |
09/14/2010 | 65 | MAG | Highway ARRA project modifications and one new Safety project. | Approved by MAG Regional Executive Committee on September 13, 2010. | 9/15/2010(FHWA) | Lupe Harriger |
09/03/2010 | 64 | ADOT | Procurement projects approved by PPAC on 9/3/2010 and one Scenic Byways project. | 9/13/2010(FHWA) | Lupe Harriger | |
09/03/2010 | 63 | MAG | Request is to add MAG's FY 2011-2015 TIP to the FY 2010-2013 STIP. | TIP approved by MAG Regional Council on July 28, 2010. Conformity analysis approved by FHWA on August 25, 2010. | 10/26/2010(FHWA) 10/26/2010(FTA) |
Lupe Harriger |
08/25/2010 | 62 | YMPO | Increase funding from $240K to $360K for Yuma County Load rating in-depth bridge inspection project (Table 5). | Approved by YMPO Executive Board on June 24, 2010. | 9/13/2010(FHWA) | Lupe Harriger |
08/09/2010 | 61 | MAG | Delete PHX09-809T. Modify funding source on VMT07-618T to include $245K (from deleted project) of Section 5309-Bus & Bus Facilities Discretionary funds, total project costs do not change. | Administrative amendment, did not go to Regional Council for approval. | 12/6/2010(FTA) | Lupe Harriger |
08/09/2010 | 60 | MAG | CMAQ Flex transfer from FHWA to FTA. | 8/23/2010(FHWA) 8/23/2010(FTA) |
Teresa Kennedy | |
08/04/2010 | 59 | MAG | One ADOT project, reconciliation of Local ARRA funds due to bid savings and one new Transit project. | Approved by MAG Reginal Council July 28, 2010. | 8/9/2010(FHWA) 8/9/2010(FTA) |
Lupe Harriger |
07/21/2010 | 58 | SEAGO | STIP amendment includes minor funding changes for the SEAGO Approved SHIP projects, change to Sierra Vista Fry Blvd, project from an ARRA to STP funded project for 201, and other minor changes to provide consistency for the local projects that are programmed to obligate in 2010. | SEAGO TIP amendment #5 approved by the SEAGO TAC July 15, 2010 and by the Administrative Council and Executive Board July 21, 2010. | 8/13/2010(FHWA) | Mark Hoffman |
07/21/2010 | 57 | CAAG | Add ARRA Bid Savings project for Apache Junction Ironwood Drive, 16th Avenue to Broadway Ave, $689,275. | Approved by CAAG TTAC June 2, 2010, CAAG Management Committee June 11, 2010 & CAAG Regional Council June 25, 2010. | 8/13/2010(FHWA) | Charla Glendening |
08/17/2010 | 56 | PAG | TIP amendment #3, Item A dated 8/11/2010 and TIP amendment #4, Items A & B | Amendment #3 adjusts funding of the JARC and New Freedoms grants to actual amounts available and Amendment #4 adjusts funding of ARRA projects due to bid savings & adjusts amount of RTA funds as local match for STP Flexed funds to Transit. | 10/26/2010(FHWA) 10/26/2010(FTA) |
Lupe Harriger |
07/19/2010 | 55 | ADOT | Deferred projects & new projects funded with FY 2010 Closeout. | Approved by the Transportation Board July 16, 2010. | 8/13/2010(FHWA) | Lupe Harriger |
07/15/2010 | 54 | PAG | PAG TIP Amendment #2, new project to purchase buses with STP Flex Transfer to FTA. | Administratively approved July 15, 2010 per direction from Regional Council July 1, 2010. | 8/2/2010(FTA) | Lupe Harriger |
07/12/2010 | 53 | NACOG | NACOG requested a STIP amendment or a number ofprojects to allocate ARRA bid savings. | Re-allocated STP funds from ARRA bid savings | 8/13/2010(FHWA) | James Zumpf |
07/08/2010 | 52 | ADOT | Change funding from State to Federal for Lukeville Port of Entry. | 8/13/2010(FHWA) | Lupe Harriger | |
07/08/2010 | 51 | PAG | Amendment #1 to the FY 2011-2015 PAG TIP. | Approved by PAG Regional Council on July 1, 2010. | 7/27/2010(FHWA) | Lupe Harriger |
07/06/2010 | 50 | FMPO | Revised Transit Table #5/Flex ARRA to Transit. | Approved by Executive Board on June 23, 2010. | 7/30/2010(FHWA) 7/30/2010(FTA) |
Lupe Harriger |
49 | MAG | >>>VOID<<< SEE AMENDMENT NO. 48 |
Approved by Regional Council on June 30, 2010. | Lupe Harriger | ||
07/06/2010 | 48 | MAG | Miscellaneous Highway projects & ARRA related Local projects, reconciliation of Transit Projects & STP-Flex and CMAQ Flex. | Approved by Regional Council on June 30, 2010. | 7/28/2010(FHWA) 7/28/2010(FTA) |
Lupe Harriger |
06/30/2010 | 47 | ADOT | New & modifications to projects approved by PPAC on June 30, 2010. | Procurement Projects, will not be forwarded to the Transportation Board. | 7/27/2010(FHWA) | Lupe Harriger |
06/25/2010 | 46 | FMPO | Corrections to 5307 Program, Tansit Table 5. | Approved by FMPO Executive Board on May 26, 2010. | 7/2/2010(FTA) | Lupe Harriger |
06/22/2010 | 45 | CYMPO | Add Regional Signage and Striping in FY10, using HSIP funding and changing the project amount previously programmed using STP funding for the Pioneer Parkway for the total amount of $1,133,000. | Approved by Executive Board on June 16, 2010. | 7/27/2010(FHWA) | Charla Glendening |
06/21/2010 | 44 | MAG | Miscellaneous project modifications. | Approved by MAG Regional Council on May 26, 2010. | 7/27/2010(FHWA) | Lupe Harriger |
06/18/2010 | 43 | ADOT | Miscellaneous new projects & project revisions. | Approved by PPAC June 2, 2010 and the Transportation Board June 18, 2010. | 7/27/2010(FHWA) | Lupe Harriger |
42 | PAG | >>>VOID<<< SEE AMENDMENT NO. 41 |
Approved by Regional Council on May 27, 2010. | Lupe Harriger | ||
07/26/2010 | 41 | PAG | TIP Amendment No. 9 (Two ADOT & various Local Project modifications). | Approved by Regional Council on May 27, 2010. | 7/28/2010(FHWA) | Lupe Harriger |
05/21/2010 | 40 | CYMPO | Amendment to the MTIP to program Pioneer Parkway Reconstruction Project in FY 10 and 11 using STP funds. | Approved by Executive Board May 19, 2010. | 7/8/2010(FHWA) | Charla Glendening |
05/21/2010 | 39 | ADOT | Miscellaneous project modifications and new projects. | Approved by State Transportation Board on May 21, 2010. | 7/8/2010(FHWA) | Lupe Harriger |
05/20/2010 | 38 | NACOG | Several amendments to the NACOG TIP, including the addition of HSIP projects to FY 2010-2014 TIP. | NACOG Regional Council approved April 22, 2010. | 7/8/2010(FHWA) | James Zumpf |
05/17/2010 | 37 | YMPO | Amendment to Table 6 to add 2010 HSIP safety projects. | Safety projects approved by the YMPO Executive Board April 29, 2010. | 7/8/2010(FHWA) | Mark Hoffman |
08/02/2010 | 36 | ADOT | $6.5M STP Flex Fund transfer. | 8/9/2010(FHWA) 8/9/2010(FTA) |
Teresa Kennedy | |
35 | MAG | >>>VOID<<< SEE AMENDMENT NO. 34 |
Approved by MAG Regional Council on April 28, 2010. | Lupe Harriger | ||
07/26/2010 | 34 | MAG | Miscellaneous project modifications (Tables A thru E). | Approved by MAG Regional Council on April 28, 2010. | 7/28/2010(FHWA) 7/28/2010(FTA) |
Lupe Harriger |
05/06/2010 | 33 | ADOT | Miscellaneous New projects to be funded with FFY 2010 Close Out. | Approved by the Transportation Board March 19, 2010. | 7/6/2010(FHWA) | Lupe Harriger |
04/26/2010 | 32 | ADOT | FFY 2010 Enhancement Projects. | Approved by PPAC March 31, 2010 & the Transportation Board April 16, 2010. | 7/6/2010(FHWA) | Lupe Harriger |
05/11/2010 | 31 | FMPO | Administrative adjustments to planned safety projects, Safe Routes to School, etc. | Approved by FMPO Executive Board on February 24, 2010. | 7/6/2010(FHWA) | Lupe Harriger |
04/19/2010 | 30 | SEAGO | Includes the SEAGO approved HSIP projects for the City of Douglas, Cochise County, and the City of Wilcox. Approved HSIP projects were inadvertantly left out of TIP amendment #2. Includes the identification of the design and construction phase of the CBI funded Chino Road Extension Project. | SEAGO Executive Board approved these project on February 20, 2010, as part of Amendment #2. | 7/6/2010(FHWA) | Mark Hoffman |
04/19/2010 | 29 | YMPO | Amendment to Table 8, FY 2010 to include additional bus shelters and the purchase of a two-way radio system utilizing potentail ARRA II funding. | Approved by the Executive Board at its regular meeting on March 25, 2010. Not Approved by FHWA on 8/12/2010, AARA II funds not approved by Congress. |
8/12/2010(FHWA) | Mark Hoffman |
04/08/2010 | 28 | MAG | Four new ADOT R/W projects and miscellaneous adjustment to 4 ADOT projects & 2 Local projects. | Approved by Regional Council on March 31, 2010. | 7/6/2010(FHWA) | Lupe Harriger |
04/19/2010 | 27 | YMPO | Table 4 FY 2010 (City of Somerton, Somerton Ave design work utilizing STP funding) & Table 5 (Bridge #9271 breakdown of design & construction). | Approved by Executive Board on March 25, 2010. | 5/19/2010(FHWA) | Mark Hoffman |
04/20/2010 | 26 | ADOT | Miscellaneous Statewide projects. | Approved by the State Transportation Board on April 16, 2010. | 5/19/2010(FHWA) | Lupe Harriger |
04/07/2010 | 25 | CAAG | Added HSIP projects for Coolidge, Payson and Apache Junction. | 5/19/2010(FHWA) | Charla Glendening | |
04/07/2010 | 24 | CYMPO | SEE AMENDMENT NO. 40 | Approved by CYMPO Executive Board March 17, 2010. Not Approved by FHWA on 8/10/2010, ARRA II funding not approved by congress. |
8/10/2010(FHWA) | Charla Glendening |
04/05/2010 | 23 | ADOT | New project: I-40/US 93 West Kingman TI. | DCR & Environmental Study. | 5/11/2010(FHWA) | Lupe Harriger |
03/30/2010 | 22 | PAG | PAG TIP Amendment #8, Item A and B. | Received administrative approval March 29, 2010. | 5/11/2010(FHWA) | Lupe Harriger |
03/30/2010 | 21 | IRR Program | Updated Indian Reservation Roads Program FY 2009 - 2013. | 5/11/2010(FHWA) | Lupe Harriger | |
03/29/2010 | 20 | PAG | PAG TIP Amendment #7, Item C. | Approved by PAG Regional Council on March 25, 2010. | 5/14/2010(FTA) | Lupe Harriger |
03/29/2010 | 19 | PAG | PAG TIP Amendment #7, Items A, B and D. | Approved by PAG Regional Council on March 25, 2010. | 5/3/2010(FHWA) | Lupe Harriger |
03/29/2010 | 18 | SEAGO | Potential ARRA II Projects. | Approved by SEAGO Executive Board on February 20, 2010. Not Approved by FHWA on 8/12/2010, AARA II funds were not approved by Congress. |
8/12/2010(FHWA) | Lupe Harriger |
03/29/2010 | 17 | SEAGO | TIP Amendment #2 - HSIP projects & City of Douglas Chino Road Extension Project. | Approved by SEAGO Executive Board on February 20, 2010. | 4/14/2010(FHWA) | Lupe Harriger |
03/19/2010 | 16 | ADOT | New projects and project modifications. | Approved by the State Transportation Board March 19, 2010. | 4/14/2010(FHWA) | Lupe Harriger |
03/11/2010 | 15 | MAG | Minor changes made to various local projects and 1 ADOT Hwy project. | Administrative modification approved by MAG Executive Director. | 4/13/2010(FHWA) | Lupe Harriger |
03/09/2010 | 14 | NACOG | TIP Amendment. | Approved by NACOG Reigonal Council February 28, 2010. | 4/12/2010(FHWA) | James Zumpf |
03/02/2010 | 13 | MAG | Highway & Transit projects programmed with ARRA. | Approved by MAG Regional Council on February 24, 2010. | 4/12/2010(FHWA) 4/12/2010(FTA) |
Lupe Harriger |
03/02/2010 | 12 | ADOT | Miscellaneous-unobligated and carried over from FY 2009-2012 STIP Amendment #57. | 3/15/2010(FHWA) | Lupe Harriger | |
02/26/2010 | 11 | ADOT | Miscellaneous New Projects and one budget increase. | Approved by the Transportation Board February 19, 2010. | 3/10/2010(FHWA) | Lupe Harriger |
02/09/2010 | 10 | CYMPO | FY09-2013 MTIP Amendment from September 11, 2009. | Not Approved by FHWA on 2/24/2010; the MPO is not an eligible FTA grantee to receive stimulus funds for the purpose and intent as identified. | 2/24/2010(FHWA) | Mark Hoffman |
02/04/2010 | 9 | CAAG | Two project modifications, includes 1 ARRA project for Payson, Roundabout on SR 87 & Airport Road. | Approved by Regional Council January 27, 2010. | 3/10/2010(FHWA) | Lupe Harriger |
02/03/2010 | 8 | YMPO | TIP revisions include ARRA II Local Projects, STP Flex Transfer, ARRA II Bus Replacement and TEA Projects. | Approved by Executive Board January 28, 2010. | 4/12/2010(FHWA) 4/12/2010(FTA) |
Lupe Harriger |
02/03/2010 | 7 | PAG | Amend the PAG FY 2010-2014 TIP to include TIP Amendments #5 and #6. | Approved by Regional Council January 28, 2010. | 2/11/2010(FHWA) | Lupe Harriger |
02/03/2010 | 6 | MAG | Amend the MAG 2008-2012 TIP to include project modifications. | Approved by Regional Council January 27, 2010. | 2/11/2010(FHWA) | Lupe Harriger |
01/28/2010 | 5 | ADOT | New projects and funding changes. | 2/4/2010(FHWA) | Lupe Harriger | |
01/26/2010 | 4 | MAG | Administrative Modifications. | Approved by Regional Council December 9, 2009. | 2/4/2010(FHWA) | Lupe Harriger |
01/11/2010 | 3 | PAG | Miscellaneous Project Modifications. | Approved by Regional Council December 10, 2009 (TIP amendment #3) & administrative approval December 18, 2009 (TIP amend. #4). | 2/4/2010(FHWA) | Lupe Harriger |
01/07/2010 | 2 | SEAGO | Include the list of 2010-2014 TIP projects into the FY 2009-2012 STIP. | Approved by SEAGOs Executive Board October 27, 2010. | 2/4/2010(FHWA) | Lupe Harriger |
01/04/2010 | 1 | CYMPO | CYMPO TIP Amendment #1. (*Included in the final STIP which was approved by FHWA January 27, 2010) | Approved by CYMPO Board and T-TAC on December 3, 2009. | 1/27/2010(FHWA)* | Bret Anderson |