Agreements

Agreements provide the institutional underpinnings for the technical integration identified in the ITS Architecture. This page lists the agreements that support Intelligent Transportation Systems in the region.

NumberTitleStatus
AG #:KR04–1793TRNADOT and DPS IntergovernmentalExisting
JPA 06–016ADOT and Glendale 2006 – Shared use of FMSExisting
IGA/JPA 09–2051ADOT and Glendale 2010Existing
C–64–15–049–M–00ADOT and McDOT Master ITS AgreementExisting
IGA /JPA 14–0004086–IADOT/Mohave County LED Enhanced Speed Limit SignsExisting
C–64–15–049–M–00–ThreeADOT–MCDOT – CVISN WZ Notification ProjectExisting
C–64–15–049–M–00–OneADOT–MCDOT – Fiber for Three Project LocationsExisting
C–64–15–049–M–00–TwoADOT–MCDOT – Third party Probe Data and AnalysisExisting
C–64–15–051–M–00AZTech ATS Control at L101 to L303 West ValleyExisting
January 2006AZTech RADS AgreementExisting
C–64–15–049–M–00–FourAZTech Visioning ProjectExisting
IGA/JPA 10–058–1Gilbert Statewide Traffic Signal Coordination Program and Traffic Safety EvaluationExisting
IGA/JPA 09–102IGlendale – CCTV Camera InstallationsExisting
AG #KR98•0521TRNHCRS – ADOT and ADEM Interagency AgreementExisting
JPA 98–119Highway Closure and Road Restriction Subsystem (HCRS)Existing
C–64–18–089–M–00IGA for research of Traffic and ITS studiesExisting
In ProcessMCDOT and ASU Research and CVPlanned
C–91–09–052–M–02–Amend2MCDOT and U of A Research and CVExisting
C–64–15–049–M–00–FivePhase I Loop 101 Mobiity ProjectPlanned
IGA/JPA 09–076IPhoenix – ITS EquipmentExisting
IGA/JPA 09–077IPhoenix ITS Equipment IIExisting