Phase I Loop 101 Mobiity Project
Number: C–64–15–049–M–00–Five
Type: Unspecified
Lead: State of Arizona
Status: Planned
Description
Phase I, or the Initiation portion, of the Loop 101 Mobility Project. Signficant partnership involved, with MCDOT and ADOT being the co–lead to develop a deployment site for large scale installation and operation of advanced transportation technologies for improving safety, efficiency and system performance. This Phase involves coalition building, deloping the Systems Engineering Management Plan, developing the ICM Plan, Project Management Support and Reporting. Phase I sets the stage for the design and installation of various technologies: Decision Support Systems; Connected Vehicle Technology for transit, incident response vehicles and roadside deployment; Adaptive Ramp Meeting; Adaptive Traffice Signal Control; ICM Mobile Application Suite.
Stakeholders
ADOT |
---|
Maricopa County Department of Transportation (MCDOT) |