ADOT Traffic Signal Interchange Integration
Description
This project integrates interchange signal timing with ramp metering operations to provide optimized flow. Source: Stakeholder Interviews
Status
Planned
Timeframe
MEDIUM: 2022-2025
Services
TM03-ADOT Traffic Signal Control |