Interface: ADOT ITS Field Equipment - ADOT Mobile EM Center

ADOT ITS Field Equipment to ADOT Mobile EM Center Interface Diagram

Architecture Flow Definitions

local signal preemption request  (Planned)  Applicable ITS Standards

Direct control signal or message to a signalized intersection that results in preemption of the current control plan and grants right-of-way to the requesting vehicle.