ADOT I-17 Flex Lanes

Description

Two lanes will be added to S/B I–17 for about 8 miles between Black Canyon City and Sunset Point. Steel gates and DMS signs will be remotely operated by the TOC.

Status: Planned

Timeframe: SHORT