PRB Actions



Return to previous page | View Schedule | PRB Decisions | Print this page


PRB Meeting Date: 1/14/2025
Request Teleconference Teleconference Phone #:
Video Teleconference

GENERAL INFORMATION
2. Form Date: 3. Project Manager/Presenter: 4. Phone Number(s): 5. Mail Drop:
1/16/2025 3:28:12 PM James Gomes (520) 388-4231 1221 S 2nd Ave, , T100
PROJECT INFORMATION
6. Project Name/Location: 7. Type of Work: 8. CPS Id:
WILLCOX, BENSON & COOLIDGE UPGRADE TRAFFIC SIGNAL DETECTION UV1Q
9. District: 10. Route: 11. County: 12. Beg. MP: 13. TRACS #: 14. Len. (mi): 15. Fed ID#:
Tucson 999 Statewide F080701X 4  
PROJECT REQUEST SUMMARY
16. Original Program Budget: $0 17. Original Program Item #: 105029
Project Budget Project Budget Project Budget
18. Current Approved: 18a. New Project/Change Request: 18b. Final:
$0 $186,000 (0%) $186,000

Funding Source(s) Funding Source(s) 20. JPA #, Signed, Adot Adv.:
19. Current Approved: 19a. New Project/Change Request:
$ 186 Item #:78825 (.) FY:0 FundSRC: Desc:  

Current Approved New Project/Change Request  
21. Fiscal Year: 21a. Fiscal Year: 25  
22. Bid Pkg Rdy Date: 22a. Bid Pkg Rdy Date: 24. Verified all of the new funding sources
23. Bid Adv Date: 23a. Bid Adv Date:

25. DESCRIPTION OF REQUEST
Establish New Project
26. JUSTIFICATION
This project will upgrade 6 traffic signal intersections with new video detection along B-10, SR186 & SR 287. This project aims to replace the outdated detection cameras and traffic detection loops that are currently in place. The existing system relies on the reduction of inductance within the traffic loop caused by the metal body of passing cars, resulting in a change in resonant frequency. This change is then detected by a signal conditioning system to control the status of the traffic lights. However, the current loops have a failure rate of 20pct per year, leading to driver frustration. To overcome these challenges, we propose the implementation of the advanced GridSmart video and Wavetronix radar detection system, which will replace the outdated and maintenance intensive loop systems. The budget will support the purchase of the detection equipment. ADOT crews will perform the installation and ICAP is included in the costs. Video Detection 1 camera System � GridSmart $96K Video Detection 2 camera System � GridSmart $29K Wavetronix System $47K ICAP $14K
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST

28. OTHER ALTERNATIVES CONSIDERED


REQUESTED ACTIONS APPROVED/RECOMMENDED ACTIONS
Establish a New Project. Item(s) Approved. Subject to PPAC Approval.