PRB Actions



Return to previous page | View Schedule | PRB Decisions | Print this page


PRB Meeting Date: 4/14/2026
Request Teleconference Teleconference Phone #:
Video Teleconference

GENERAL INFORMATION
2. Form Date: 3. Project Manager/Presenter: 4. Phone Number(s): 5. Mail Drop:
5/11/2026 1:56:32 PM Myrna Bondoc 480-932-7319 206 S 17th Ave, , 304M
PROJECT INFORMATION
6. Project Name/Location: 7. Type of Work: 8. CPS Id:
BURNT WELL REST AREA TRUCK PARKING EXPANSION TR1Q
9. District: 10. Route: 11. County: 12. Beg. MP: 13. TRACS #: 14. Len. (mi): 15. Fed ID#:
Yuma 10 Maricopa 86 F077901C 1 010-A(242)T
PROJECT REQUEST SUMMARY
16. Original Program Budget: $7,680,000 17. Original Program Item #: 104935
Project Budget Project Budget Project Budget
18. Current Approved: 18a. New Project/Change Request: 18b. Final:
$7,680,000 $6,050,000 (0%) $13,730,000

Funding Source(s) Funding Source(s) 20. JPA #, Signed, Adot Adv.:
19. Current Approved: 19a. New Project/Change Request:
$ 7680 Item #:104935 (Truck Parking Subprogram) FY:0 FundSRC: Desc: $ 6050 Item #:77826 ( Freight Subprogram) FY:0 FundSRC: Desc:  

Current Approved New Project/Change Request  
21. Fiscal Year: FY26 21a. Fiscal Year:  
22. Bid Pkg Rdy Date: 22a. Bid Pkg Rdy Date: 24. Verified all of the new funding sources
23. Bid Adv Date: 23a. Bid Adv Date:

25. DESCRIPTION OF REQUEST
Increase Budget.
26. JUSTIFICATION
I-10 is by far the busiest freight route in the state. Burnt Well Rest Area is located on I-10 approximately 56 miles west of central Phoenix. The original pavement surface planned for Burnt Well was a permeable paver material recently installed at the Haviland and Sunset Point overflow truck parking lots. This permeable paver material is more cost-effective than asphalt. However, since this material is new to ADOT, it is in the State`s best interest to monitor and assess its performance under heavy truck traffic before installing more of it. Asphaltic concrete will be placed at Burnt Well Rest Area. In the 2022 Rest Area Study, Burnt Well was identified to be deficient in bathroom stalls without increasing parking capacity. This project will construct overflow truck parking lots; 82 truck parking spaces for eastbound traffic and 43 truck parking spaces for westbound traffic. The addition of these overflow parking lots makes the current restroom deficiency worse. To reduce the deficiency, the project will install prefabricated restroom buildings at the overflow lots, connecting them to a septic system and extending water lines to provide water. This is a more cost effective solution than expanding the main restroom buildings. We also recommend the implementation of a Truck Parking Availability System (TPAS) at Burnt Well. The Bouse Wash Rest Area, located 50 miles west of Burnt Well, is the busiest rest area in the state but is not a suitable candidate for expansion. When either rest area reaches full capacity, it would be beneficial for truckers to be informed about the availability of truck parking spaces just 50 miles away, to deter them from parking in unsafe, undesignated areas. Bouse Wash is already equipped with TPAS. ICAP is included in this request.
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST

28. OTHER ALTERNATIVES CONSIDERED


REQUESTED ACTIONS APPROVED/RECOMMENDED ACTIONS
Item(s) Approved. Subject to PPAC Approval.


PRB Meeting Date: 10/21/2025
Request Teleconference Teleconference Phone #:
Video Teleconference

GENERAL INFORMATION
2. Form Date: 3. Project Manager/Presenter: 4. Phone Number(s): 5. Mail Drop:
10/23/2025 9:35:15 AM Myrna Bondoc 480-932-7319 206 S 17th Ave, , 304M
PROJECT INFORMATION
6. Project Name/Location: 7. Type of Work: 8. CPS Id:
BURNT WELL REST AREA TRUCK PARKING EXPANSION TR1Q
9. District: 10. Route: 11. County: 12. Beg. MP: 13. TRACS #: 14. Len. (mi): 15. Fed ID#:
Yuma 10 Maricopa 86 F077901R 1 010-A(242)T
PROJECT REQUEST SUMMARY
16. Original Program Budget: $308,000 17. Original Program Item #: 104935
Project Budget Project Budget Project Budget
18. Current Approved: 18a. New Project/Change Request: 18b. Final:
$308,000 $0 (0%) $308,000

Funding Source(s) Funding Source(s) 20. JPA #, Signed, Adot Adv.:
19. Current Approved: 19a. New Project/Change Request:
$ 308 Item #:104935 ( ) FY:0 FundSRC: Desc:  

Current Approved New Project/Change Request  
21. Fiscal Year: 21a. Fiscal Year:  
22. Bid Pkg Rdy Date: 22a. Bid Pkg Rdy Date: 24. Verified all of the new funding sources
23. Bid Adv Date: 23a. Bid Adv Date:

25. DESCRIPTION OF REQUEST
Establish 01R Subphase.
26. JUSTIFICATION
This request is to establish the ROW phase of the Burnt Well Rest Area Truck Parking Expansion Project. ICAP is included in this request.
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST

28. OTHER ALTERNATIVES CONSIDERED


REQUESTED ACTIONS APPROVED/RECOMMENDED ACTIONS
Item(s) Approved.


PRB Meeting Date: 9/16/2025
Request Teleconference Teleconference Phone #:
Video Teleconference

GENERAL INFORMATION
2. Form Date: 3. Project Manager/Presenter: 4. Phone Number(s): 5. Mail Drop:
9/18/2025 6:31:01 PM Myrna Bondoc 480-932-7319 206 S 17th Ave, , 304M
PROJECT INFORMATION
6. Project Name/Location: 7. Type of Work: 8. CPS Id:
BURNT WELL REST AREA TRUCK PARKING EXPANSION TR1Q
9. District: 10. Route: 11. County: 12. Beg. MP: 13. TRACS #: 14. Len. (mi): 15. Fed ID#:
Yuma 10 Maricopa 86 F077901D 1 010-A(242)T
PROJECT REQUEST SUMMARY
16. Original Program Budget: $620,000 17. Original Program Item #: 104935
Project Budget Project Budget Project Budget
18. Current Approved: 18a. New Project/Change Request: 18b. Final:
$620,000 $500,000 (0%) $1,120,000

Funding Source(s) Funding Source(s) 20. JPA #, Signed, Adot Adv.:
19. Current Approved: 19a. New Project/Change Request:
$ 620 Item #:79625 (Truck Parking Subprogram) FY:0 FundSRC: Desc: $ 500 Item #:72326 ( Truck Parking Subprogram) FY:0 FundSRC: Desc:  

Current Approved New Project/Change Request  
21. Fiscal Year: 21a. Fiscal Year:  
22. Bid Pkg Rdy Date: 22a. Bid Pkg Rdy Date: 24. Verified all of the new funding sources
23. Bid Adv Date: 23a. Bid Adv Date:

25. DESCRIPTION OF REQUEST
Increase budget
26. JUSTIFICATION
Subprogram 796 was established with a finite amount of $50M to strictly do all truck parking projects. The combined cost of all truck parking projects cannot exceed the $50M and truck parking projects cannot be supplemented by any other funding source. Excess truck parking funds are removed from completed subphases so they can be used on other truck parking projects that have funding shortfalls. A portion of the funds removed from other Truck Parking Projects is being added to this project. Reason for Increase: 1) Cost of ROW acquisition was more than expected. 2) This is a CMAR project and CMAR pre-construction cost will be paid from this phase. 3) Consultant cost for an independent cost estimate, ICE, will be paid from this phase. ICAP is included in this request.
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST

28. OTHER ALTERNATIVES CONSIDERED


REQUESTED ACTIONS APPROVED/RECOMMENDED ACTIONS
Item(s) Approved.


PRB Meeting Date: 10/29/2024
Request Teleconference Teleconference Phone #:
Video Teleconference

GENERAL INFORMATION
2. Form Date: 3. Project Manager/Presenter: 4. Phone Number(s): 5. Mail Drop:
10/31/2024 12:38:09 PM Myrna Bondoc 480-932-7319 206 S 17th Ave, , 304M
PROJECT INFORMATION
6. Project Name/Location: 7. Type of Work: 8. CPS Id:
BURNT WELL REST AREA TRUCK PARKING EXPANSION TR1Q
9. District: 10. Route: 11. County: 12. Beg. MP: 13. TRACS #: 14. Len. (mi): 15. Fed ID#:
Yuma 10 Maricopa 86 F077901D 1 010-A(242)T
PROJECT REQUEST SUMMARY
16. Original Program Budget: $0 17. Original Program Item #:
Project Budget Project Budget Project Budget
18. Current Approved: 18a. New Project/Change Request: 18b. Final:
$0 $620,000 (0%) $620,000

Funding Source(s) Funding Source(s) 20. JPA #, Signed, Adot Adv.:
19. Current Approved: 19a. New Project/Change Request:
$ 620 Item #:79625 ( ) FY:0 FundSRC: Desc:  

Current Approved New Project/Change Request  
21. Fiscal Year: 21a. Fiscal Year:  
22. Bid Pkg Rdy Date: 22a. Bid Pkg Rdy Date: 24. Verified all of the new funding sources
23. Bid Adv Date: 23a. Bid Adv Date:

25. DESCRIPTION OF REQUEST
Establish a new project.
26. JUSTIFICATION
This request is to establish the design to construct overflow truck parking at the Burnt Well Rest area. The CMAR method will be used to deliver this project. $450K Consultant $121K Staff $49K ICAP
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST

28. OTHER ALTERNATIVES CONSIDERED


REQUESTED ACTIONS APPROVED/RECOMMENDED ACTIONS
Establish a New Project. Item(s) Approved.


PRB Meeting Date: 10/29/2024
Request Teleconference Teleconference Phone #:
Video Teleconference

GENERAL INFORMATION
2. Form Date: 3. Project Manager/Presenter: 4. Phone Number(s): 5. Mail Drop:
10/31/2024 12:38:54 PM Myrna Bondoc 480-932-7319 206 S 17th Ave, , 304M
PROJECT INFORMATION
6. Project Name/Location: 7. Type of Work: 8. CPS Id:
BURNT WELL REST AREA TRUCK PARKING EXPANSION TR1Q
9. District: 10. Route: 11. County: 12. Beg. MP: 13. TRACS #: 14. Len. (mi): 15. Fed ID#:
Yuma 10 Maricopa 86 F077901R 1 010-A(242)T
PROJECT REQUEST SUMMARY
16. Original Program Budget: $350,000 17. Original Program Item #:
Project Budget Project Budget Project Budget
18. Current Approved: 18a. New Project/Change Request: 18b. Final:
$350,000 $0 (0%) $350,000

Funding Source(s) Funding Source(s) 20. JPA #, Signed, Adot Adv.:
19. Current Approved: 19a. New Project/Change Request:
$ 350 Item #:79625 (Line Item 104375) FY:0 FundSRC: Desc:  

Current Approved New Project/Change Request  
21. Fiscal Year: 21a. Fiscal Year:  
22. Bid Pkg Rdy Date: 22a. Bid Pkg Rdy Date: 24. Verified all of the new funding sources
23. Bid Adv Date: 23a. Bid Adv Date:

25. DESCRIPTION OF REQUEST
Establish 01R subphase
26. JUSTIFICATION
This request is to establish the ROW phase of the Burnt Well Rest Area Truck Parking Expansion Project. ICAP is included in this request.
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST

28. OTHER ALTERNATIVES CONSIDERED


REQUESTED ACTIONS APPROVED/RECOMMENDED ACTIONS
Establish a New Project. Request Withdrawn.