PRB Actions



Return to previous page | View Schedule | PRB Decisions | Print this page


PRB Meeting Date: 2/14/2023
Request Teleconference Teleconference Phone #:
Video Teleconference

GENERAL INFORMATION
2. Form Date: 3. Project Manager/Presenter: 4. Phone Number(s): 5. Mail Drop:
2/16/2023 2:10:26 PM Pei-jung Li (602) 712-8708 205 S 17th Ave, , 605E
PROJECT INFORMATION
6. Project Name/Location: 7. Type of Work: 8. CPS Id:
WASH, MOENKOPI WASH & FIVE MILE WASH BRIDGES BRIDGE REHABILITATION TP1O
9. District: 10. Route: 11. County: 12. Beg. MP: 13. TRACS #: 14. Len. (mi): 15. Fed ID#:
Flagstaff 89 Coconino 471 F033301C 3.0 089-D(208)T
PROJECT REQUEST SUMMARY
16. Original Program Budget: $2,584,000 17. Original Program Item #: 100221
Project Budget Project Budget Project Budget
18. Current Approved: 18a. New Project/Change Request: 18b. Final:
$2,584,000 $54,000 (0%) $2,638,000

Funding Source(s) Funding Source(s) 20. JPA #, Signed, Adot Adv.:
19. Current Approved: 19a. New Project/Change Request:
$ 2584 Item #: 100221 (BRIDGE REHABILITATION ) FY:0 FundSRC: Desc: $ 54 Item #:76223 (.) FY:2023 FundSRC:. Desc:BRIDGE REPLACEMENT & REHABILITATION  

Current Approved New Project/Change Request  
21. Fiscal Year: 23 21a. Fiscal Year:  
22. Bid Pkg Rdy Date: 12/1/2022 22a. Bid Pkg Rdy Date: 2/24/2023 24. Verified all of the new funding sources
23. Bid Adv Date: 12/30/2022 23a. Bid Adv Date: 3/31/2023

25. DESCRIPTION OF REQUEST
Change quarter Increase budget
26. JUSTIFICATION
The project needs to be deferred to FY23 3Q due to minor changes after Stage IV, 404 application review and the team needed additional time to complete design. Several major item unit cost estimates increased between Stage III (April 2022) and Post-Stage IV (Jan 2023). Those items are: Roadway excavation, Embankment spillway, Temporary concrete barrier (installation and removal), Temporary preformed marking, SWZ system, Bridge repair (PPC deck overlay) and Polyester polymer concrete bridge deck repair. ICAP is included in this request.
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST

28. OTHER ALTERNATIVES CONSIDERED


REQUESTED ACTIONS APPROVED/RECOMMENDED ACTIONS
Change in Schedule. Item(s) Approved.


PRB Meeting Date: 2/7/2023
Request Teleconference Teleconference Phone #:
Video Teleconference

GENERAL INFORMATION
2. Form Date: 3. Project Manager/Presenter: 4. Phone Number(s): 5. Mail Drop:
2/14/2023 10:51:39 AM Pei-jung Li (602) 712-8708 205 S 17th Ave, , 605E
PROJECT INFORMATION
6. Project Name/Location: 7. Type of Work: 8. CPS Id:
WASH, MOENKOPI WASH & FIVE MILE WASH BRIDGES BRIDGE REHABILITATION TP1O
9. District: 10. Route: 11. County: 12. Beg. MP: 13. TRACS #: 14. Len. (mi): 15. Fed ID#:
Flagstaff 89 Coconino 471 F033301C 3.0 089-D(208)T
PROJECT REQUEST SUMMARY
16. Original Program Budget: $2,584,000 17. Original Program Item #: 100221
Project Budget Project Budget Project Budget
18. Current Approved: 18a. New Project/Change Request: 18b. Final:
$2,584,000 $160,000 (0%) $2,744,000

Funding Source(s) Funding Source(s) 20. JPA #, Signed, Adot Adv.:
19. Current Approved: 19a. New Project/Change Request:
$ 2584 Item #: 100221 (BRIDGE REHABILITATION ) FY:0 FundSRC: Desc: $ 160 Item #:76223 (.) FY:2023 FundSRC:. Desc:BRIDGE REPLACEMENT & REHABILITATION  

Current Approved New Project/Change Request  
21. Fiscal Year: 23 21a. Fiscal Year:  
22. Bid Pkg Rdy Date: 12/1/2022 22a. Bid Pkg Rdy Date: 2/24/2023 24. Verified all of the new funding sources
23. Bid Adv Date: 12/30/2022 23a. Bid Adv Date: 3/31/2023

25. DESCRIPTION OF REQUEST
Change quarter Increase budget
26. JUSTIFICATION
Project is being deferred to FY23 3Q due to Bridge Group Subprogram new priority list. Several major item unit costs increased between Stage III (April,2022) and Post-Stage IV (Jan 2023) including Roadway excavation, Embankment spillway, Temporary concrete barrier (installation and removal), Temporary preformed marking, SWZ system, Bridge repair (PPC deck overlay) and Polyester polymer concrete bridge deck repair Estimates have been reviewed and approved by C&S. ICAP was included
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST

28. OTHER ALTERNATIVES CONSIDERED


REQUESTED ACTIONS APPROVED/RECOMMENDED ACTIONS
FYI/Guidance. Will return in coming weeks.


PRB Meeting Date: 12/6/2022
Request Teleconference Teleconference Phone #:
Video Teleconference

GENERAL INFORMATION
2. Form Date: 3. Project Manager/Presenter: 4. Phone Number(s): 5. Mail Drop:
12/7/2022 9:47:17 AM Pei-jung Li (602) 712-8708 205 S 17th Ave, , 605E
PROJECT INFORMATION
6. Project Name/Location: 7. Type of Work: 8. CPS Id:
WASH, MOENKOPI WASH & FIVE MILE WASH BRIDGES BRIDGE REHABILITATION TP1O
9. District: 10. Route: 11. County: 12. Beg. MP: 13. TRACS #: 14. Len. (mi): 15. Fed ID#:
Flagstaff 89 Coconino 471 F033301C 089-D(208)T
PROJECT REQUEST SUMMARY
16. Original Program Budget: $2,584,000 17. Original Program Item #: 100221
Project Budget Project Budget Project Budget
18. Current Approved: 18a. New Project/Change Request: 18b. Final:
$2,584,000 ($2,584,000) (0%) $0

Funding Source(s) Funding Source(s) 20. JPA #, Signed, Adot Adv.:
19. Current Approved: 19a. New Project/Change Request:
$ 2584 Item #: 100221 (BRIDGE REHABILITATION ) FY:0 FundSRC: Desc: $ -2584 Item #:76223 (.) FY:2023 FundSRC:. Desc:BRIDGE REPLACEMENT & REHABILITATION  

Current Approved New Project/Change Request  
21. Fiscal Year: 23 21a. Fiscal Year: 24  
22. Bid Pkg Rdy Date: 12/1/2022 22a. Bid Pkg Rdy Date: 24. Verified all of the new funding sources
23. Bid Adv Date: 12/30/2022 23a. Bid Adv Date:

25. DESCRIPTION OF REQUEST
Defer Project
26. JUSTIFICATION
Due to the Biology review delay in Navajo Nation and the follow-up 404 permit process, the advertisement needs to move to 3Q FY23. Additional funding is needed for extra CE cost and overall unit cost increase after the stage IV review, ICAP is included in this request.
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST

28. OTHER ALTERNATIVES CONSIDERED


REQUESTED ACTIONS APPROVED/RECOMMENDED ACTIONS
Change in FY. Request Withdrawn.


PRB Meeting Date: 5/24/2022
Request Teleconference Teleconference Phone #:
Video Teleconference

GENERAL INFORMATION
2. Form Date: 3. Project Manager/Presenter: 4. Phone Number(s): 5. Mail Drop:
5/26/2022 8:57:04 AM Pei-jung Li (602) 712-8708 205 S 17th Ave, , 605E
PROJECT INFORMATION
6. Project Name/Location: 7. Type of Work: 8. CPS Id:
WASH, MOENKOPI WASH & FIVE MILE WASH BRIDGES BRIDGE REHABILITATION TP1O
9. District: 10. Route: 11. County: 12. Beg. MP: 13. TRACS #: 14. Len. (mi): 15. Fed ID#:
Flagstaff 89 Coconino 471 F033301C 089-D(208)T
PROJECT REQUEST SUMMARY
16. Original Program Budget: $2,100,000 17. Original Program Item #: 100221
Project Budget Project Budget Project Budget
18. Current Approved: 18a. New Project/Change Request: 18b. Final:
$2,100,000 $333,000 (0%) $2,433,000

Funding Source(s) Funding Source(s) 20. JPA #, Signed, Adot Adv.:
19. Current Approved: 19a. New Project/Change Request:
$ 1500 Item #: 100221 (BRIDGE REHABILITATION ) FY:0 FundSRC: Desc: $ 333 Item #:76223 (.) FY:2023 FundSRC:. Desc:BRIDGE REPLACEMENT & REHABILITATION  

Current Approved New Project/Change Request  
21. Fiscal Year: 23 21a. Fiscal Year:  
22. Bid Pkg Rdy Date: 11/20/2022 22a. Bid Pkg Rdy Date: 24. Verified all of the new funding sources
23. Bid Adv Date: 12/26/2022 23a. Bid Adv Date:

25. DESCRIPTION OF REQUEST
Increase Construction Budget
26. JUSTIFICATION
The stage III estimate includes the number of roadway items (roadway excavation; AB, AC; guardrail and embankment items ) with detailed quantities and the latest unit cost. This amount exceeds the current program included under a 30 percent contingency for unidentified items in Stage II. ICAP is included in this request. These changes are included in the Tentative Program. These changes will be placed in the FY23 - FY27 Five Year Program.
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST

28. OTHER ALTERNATIVES CONSIDERED


REQUESTED ACTIONS APPROVED/RECOMMENDED ACTIONS
Request Withdrawn. PM withdrew request since revised budget was given to MPD in Dec. and was included in Feb. Tentative


PRB Meeting Date: 4/27/2021
Request Teleconference Teleconference Phone #:
Video Teleconference

GENERAL INFORMATION
2. Form Date: 3. Project Manager/Presenter: 4. Phone Number(s): 5. Mail Drop:
6/4/2021 10:37:22 AM Pei-jung Li (602) 712-8708 205 S 17th Ave, , 605E
PROJECT INFORMATION
6. Project Name/Location: 7. Type of Work: 8. CPS Id:
WASH, MOENKOPI WASH & FIVE MILE WASH BRIDGES BRIDGE REHABILITATION TP1O
9. District: 10. Route: 11. County: 12. Beg. MP: 13. TRACS #: 14. Len. (mi): 15. Fed ID#:
Flagstaff 89 Coconino 471 F033301C 089-D(208)T
PROJECT REQUEST SUMMARY
16. Original Program Budget: $1,500,000 17. Original Program Item #: 100221
Project Budget Project Budget Project Budget
18. Current Approved: 18a. New Project/Change Request: 18b. Final:
$1,500,000 $600,000 (0%) $2,100,000

Funding Source(s) Funding Source(s) 20. JPA #, Signed, Adot Adv.:
19. Current Approved: 19a. New Project/Change Request:
$ 1500 Item #: 100221 (BRIDGE REHABILITATION ) FY:0 FundSRC: Desc: $ 600 Item #:76223 (.) FY:2023 FundSRC:. Desc:BRIDGE REPLACEMENT & REHABILITATION  

Current Approved New Project/Change Request  
21. Fiscal Year: 23 21a. Fiscal Year:  
22. Bid Pkg Rdy Date: 7/1/2022 22a. Bid Pkg Rdy Date: 24. Verified all of the new funding sources
23. Bid Adv Date: 7/24/2022 23a. Bid Adv Date:

25. DESCRIPTION OF REQUEST
Add scope & Increase Construction Budget
26. JUSTIFICATION
After the stage II field review, more erosion and scour/void were recognized at Wash, Moenkopi Wash & Five Mile Wash Bridges. ADOT Bridge Design indicated that additional storm water control items are needed. These include adding under bridge grout rip-rap, fixing end of bridge barrier, using ground penetrating radar for voids, bringing eroded embankment back to grade and replacing joint on wing wall and abutment. The original estimate developed in current program did not include this additional scope, a 30 percent contingency for unidentified items, and 3 percent inflation factor for year of expenditure. ICAP is included in this request. Contingent on PPAC approval this will be included in the FY22 - FY26 Five Year Program.
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST

28. OTHER ALTERNATIVES CONSIDERED


REQUESTED ACTIONS APPROVED/RECOMMENDED ACTIONS
Change in Scope. Item(s) Approved. Subject to PPAC Approval.


PRB Meeting Date: 5/5/2020
Request Teleconference Teleconference Phone #:
Video Teleconference

GENERAL INFORMATION
2. Form Date: 3. Project Manager/Presenter: 4. Phone Number(s): 5. Mail Drop:
5/28/2020 12:23:03 PM Pei-jung Li (602) 712-8708 205 S 17th Ave, , 605E
PROJECT INFORMATION
6. Project Name/Location: 7. Type of Work: 8. CPS Id:
WASH BRIDGE BRIDGE REHABILITATION TP1O
9. District: 10. Route: 11. County: 12. Beg. MP: 13. TRACS #: 14. Len. (mi): 15. Fed ID#:
Flagstaff 89 Coconino 471 F033301D  
PROJECT REQUEST SUMMARY
16. Original Program Budget: $500,000 17. Original Program Item #: 100221
Project Budget Project Budget Project Budget
18. Current Approved: 18a. New Project/Change Request: 18b. Final:
$500,000 $0 (0%) $500,000

Funding Source(s) Funding Source(s) 20. JPA #, Signed, Adot Adv.:
19. Current Approved: 19a. New Project/Change Request:
$ 500 Item #: 100221 (WASH BRIDGE - BRIDGE REHABILITATION ) FY:0 FundSRC: Desc:  

Current Approved New Project/Change Request  
21. Fiscal Year: 21a. Fiscal Year:  
22. Bid Pkg Rdy Date: 22a. Bid Pkg Rdy Date: 24. Verified all of the new funding sources
23. Bid Adv Date: 23a. Bid Adv Date:

25. DESCRIPTION OF REQUEST
Establish new design project
26. JUSTIFICATION
The original scoping and design budget is only for Wash Bridge # 582 replacement on SR 89 MP 482. Based upon the latest Bridge field inspection in early March 2020, within project vicinity, rehab work on two other bridges is identified as needed. Request to establish the project with the following scope. Wash Bridge Structure # 582 at MP 481.89 on SR89 � PCC overlay and substructure repair. Moenkopi Wash Bridge#2452 at MP 477.12 on SR89 � PCC overlay Five Mile Wash Bridge#697 at MP 471.73 on SR89 - PCC overlay and wing wall separation. repairing with concrete patching. Request to establish the project with the following name: "Wash, Moenkopi Wash & Five Mile Wash Bridges". Staff - $410K Consultant - $45K (Environmental and compliance review) ICAP - $45K
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST

28. OTHER ALTERNATIVES CONSIDERED


REQUESTED ACTIONS APPROVED/RECOMMENDED ACTIONS
Establish a New Project. Item(s) Approved.


For Project Resource Office information or questions: PRO Mailbox

Arizona Department of Transportation