PRB Actions |
Return to previous page | View Schedule | PRB Decisions | Print this page |
PRB Meeting Date: 12/19/2023 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
12/22/2023 9:48:24 AM | Pei-jung Li | (602) 712-8708 | 205 S 17th Ave, , 605E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
PRESCOTT LAKES PKWY - FRONTIER VILLAGE | ROADWAY WIDENING | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901C | 1.0 | 069-A(217)T |
16. Original Program Budget: $10,853,000 | 17. Original Program Item #: 100248 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$10,853,000 | $1,824,000 (0%) | $12,677,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | 17-0006334-I |
$ 9713 Item #:100248 (NHPP ) FY:2020 FundSRC:. Desc:Prescott Lakes Parkway - Frontier Village | $ 1824 Item #:72324 ( ) FY:2024 FundSRC:. Desc:CONTINGENCY |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 23 | 21a. Fiscal Year: | ||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 6/1/2023 | 23a. Bid Adv Date: | 2/23/2024 |
25. DESCRIPTION OF REQUEST |
Increase budget |
26. JUSTIFICATION |
This project was previously advertised, and all bids were rejected. the Design Team re-evaluated the project focusing on performance based practical design. This resulted in eliminating the concrete path underneath the trail, reducing the retaining wall height and length, adding additional riprap to address offsite flow, changing the inlet type to avoid minor drainage blockage and revising the pavement structural section. Although the current construction costs increased, this approach provides improved long term value. ICAP is included in this request. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Change in Schedule. | Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 4/18/2023 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
4/20/2023 8:14:09 AM | Pei-jung Li | (602) 712-8708 | 205 S 17th Ave, , 605E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
PRESCOTT LAKES PKWY - FRONTIER VILLAGE | ROADWAY WIDENING | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901C | 1.0 | 069-A(217)T |
16. Original Program Budget: $10,300,000 | 17. Original Program Item #: 100248 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$10,300,000 | $500,000 (0%) | $10,800,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | 17-0006334-I |
$ 9713 Item #:100248 (NHPP ) FY:2020 FundSRC:. Desc:Prescott Lakes Parkway - Frontier Village | $ 500 Item #:72323 ( ) FY:2023 FundSRC:. Desc:CONTINGENCY |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 23 | 21a. Fiscal Year: | ||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 6/23/2023 | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Increase budget |
26. JUSTIFICATION |
The design team found out that the final construction budget needed was higher than expected after completing the Stage IV PS&E. This was due to the high unit costs of pavement, concrete, and excavation, etc. The ADOT U&RR Group will give conditional clearance by the end of April based on the latest CenturyLink/Lumen relocation work schedule, which should be finished by the first week of June. ICAP is included in this request. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 12/6/2022 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
12/8/2022 12:34:26 PM | Pei-jung Li | (602) 712-8708 | 205 S 17th Ave, , 605E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
PRESCOTT LAKES PKWY - FRONTIER VILLAGE | WIDEN FROM 4 LANES TO 6 | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901U | 1.0 | 069-A(217)T |
16. Original Program Budget: $300,000 | 17. Original Program Item #: 100248 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$300,000 | ($300,000) (0%) | $0 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | 17-0006334-I |
$ 300 Item #:100248 (Utility Relocation) FY:2020 FundSRC:. Desc:Prescott Lakes Parkway - Frontier Village | $ -300 Item #:72323 (no utility prior rights confirmation) FY:2023 FundSRC:. Desc:CONTINGENCY |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Delete Utility sub-phase |
26. JUSTIFICATION |
ADOT Utility confirmed that the there is no prior rights for all Utility relation within project vicinity. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Delete Project. | Item(s) Approved. |
PRB Meeting Date: 12/6/2022 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
12/8/2022 12:34:12 PM | Pei-jung Li | (602) 712-8708 | 205 S 17th Ave, , 605E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
PRESCOTT LAKES PKWY - FRONTIER VILLAGE | Roadway Widening | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901C | 1.0 | 069-A(217)T |
16. Original Program Budget: $10,300,000 | 17. Original Program Item #: 100248 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$10,300,000 | $0 (0%) | $10,300,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | 17-0006334-I |
$ 9713 Item #:100248 (NHPP ) FY:2020 FundSRC:. Desc:Prescott Lakes Parkway - Frontier Village |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 23 | 21a. Fiscal Year: | ||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 3/17/2022 | 24. Verified all of the new funding sources | |
23. Bid Adv Date: | 12/16/2022 | 23a. Bid Adv Date: | 4/20/2022 |
25. DESCRIPTION OF REQUEST |
Change Schedule |
26. JUSTIFICATION |
The project advertisement needs to move to 4Q FY23 due to the unexpected prolonged Unisource design and relocation schedule. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Change in Schedule. | Item(s) Approved. |
PRB Meeting Date: 4/19/2022 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
4/22/2022 8:55:40 AM | Pei-jung Li | (602) 712-8708 | 205 S 17th Ave, , 605E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
PRESCOTT LAKES PKWY - FRONTIER VILLAGE | WIDEN FROM 4 LANES TO 6 | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901U | 1.0 | 069-A(217)T |
16. Original Program Budget: $300,000 | 17. Original Program Item #: 100248 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$300,000 | $0 (0%) | $300,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | 17-0006334-I |
$ 300 Item #:100248 (Utility Relocation) FY:2020 FundSRC:. Desc:Prescott Lakes Parkway - Frontier Village |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Establish Utility sub-phase |
26. JUSTIFICATION |
The Unisource and CenturyLink submitted ADOT the easement and prior right documentations. This amount of initial utility relocation budget was determined based upon the current design and conflict identification. The final utility fee will be evaluated in Utility Agreements. utility relocation fee - $271K ICAP - $29K |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Establish a New Project. | Item(s) Approved. |
PRB Meeting Date: 4/19/2022 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
6/6/2022 2:29:20 PM | Pei-jung Li | (602) 712-8708 | 205 S 17th Ave, , 605E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
PRESCOTT LAKES PKWY - FRONTIER VILLAGE | Roadway Widening | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901D | 1.0 | 069-A(217)T |
16. Original Program Budget: $1,000,000 | 17. Original Program Item #: 100248 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$1,000,000 | $350,000 (0%) | $1,350,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | 17-0006334-I |
$ 150 Item #:OTHR18 ( City of Prescott) FY:0 FundSRC: Desc: | $ 117 Item #:OTHR22 (CYMPO STBGP Funds) FY:0 FundSRC: Desc: |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Change Scope Increase budget |
26. JUSTIFICATION |
The project will be moved forward without the Multi-Use Pathway and pedestrian lighting elements, as agreed to by the City of Prescott and CYMPO. Staff $65K Consultant $251K ICAP $34K |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Change in Scope. | Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 5/25/2021 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
6/4/2021 12:08:40 PM | Pei-jung Li | (602) 712-8708 | 205 S 17th Ave, , 605E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
PRESCOTT LAKES PKWY - FRONTIER VILLAGE | WIDEN FROM 4 LANES TO 6 | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901U | 1.0 | 069-A(217)T |
16. Original Program Budget: $300,000 | 17. Original Program Item #: 100248 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$300,000 | $0 (0%) | $300,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | 17-0006334- |
$ 300 Item #:100248 (Utility Relocation) FY:2020 FundSRC:. Desc:Prescott Lakes Parkway - Frontier Village | $ -300 Item #:72321 ( ) FY:2021 FundSRC:. Desc:CONTINGENCY |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | 22 | ||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Defer Utility Phase |
26. JUSTIFICATION |
The design funding for utility preliminary engineering will be available in FY 22 from Central Yavapai Metropolitan Planning Organization (CYMPO), Yavapai County, and City of Prescott. This project is on hold now due to insufficient design funding. Utility phase will move to Fiscal Year 22. Contingent upon PPAC Approval, this will be included in the FY22 - FY26 Five Year Program. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Change in FY. | Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 5/25/2021 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
6/4/2021 12:09:05 PM | Pei-jung Li | (602) 712-8708 | 205 S 17th Ave, , 605E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
PRESCOTT LAKES PKWY - FRONTIER VILLAGE | WIDEN FROM 4 LANES TO 6 | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901R | 1.0 | 069-A(217)T |
16. Original Program Budget: $975,000 | 17. Original Program Item #: 100248 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$975,000 | $0 (0%) | $975,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | 17-0006334- |
$ 975 Item #:100248 ( ) FY:2020 FundSRC:. Desc:Prescott Lakes Parkway - Frontier Village |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Establish ROW subphase |
26. JUSTIFICATION |
Request to obligate the right-of-way acquisition (01R) funding for the design project to meet the construction target in FY23. The construction for this project will move from FY22 to FY23 in the 2022-2026 ADOT Five-Year Transportation Facilities Construction Program as Item No. 100248. Environmental clearance had been issued on May 19, 2021. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Establish a New Project. | Item(s) Approved. |
PRB Meeting Date: 5/25/2021 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
6/4/2021 12:10:44 PM | Pei-jung Li | (602) 712-8708 | 205 S 17th Ave, , 605E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
PRESCOTT LAKES PKWY - FRONTIER VILLAGE | WIDEN FROM 4 LANES TO 6 | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901C | 1.0 | 069-A(217)T |
16. Original Program Budget: $10,000,000 | 17. Original Program Item #: 100248 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$10,000,000 | $300,000 (0%) | $10,300,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | 17-0006334- |
$ 10000 Item #:100248 (NHPP) FY:2020 FundSRC:. Desc:Prescott Lakes Parkway - Frontier Village | $ -10000 Item #:72321 ( ) FY:2021 FundSRC:. Desc:CONTINGENCY |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 22 | 21a. Fiscal Year: | 23 | |
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Defer project |
26. JUSTIFICATION |
This project is on hold now due to insufficient design funding. Time is needed to complete design and acquire ROW. The construction project will move from FY22 to FY23. Contingent upon PPAC Approval, this will be included in the FY22 - FY26 Five Year Program. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Change in FY. | Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 4/6/2021 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
6/4/2021 9:14:55 AM | Pei-jung Li | (602) 712-8708 | 205 S 17th Ave, , 605E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
PRESCOTT LAKES PKWY - FRONTIER VILLAGE | Roadway Widening | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901C | 1.0 | 069-A(217)T |
16. Original Program Budget: $10,000,000 | 17. Original Program Item #: 100248 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$10,000,000 | $300,000 (0%) | $10,300,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | 17-0006334-I |
$ 10000 Item #:100248 (.) FY:2020 FundSRC:. Desc:Prescott Lakes Parkway - Frontier Village | $ 300 Item #:72322 ( ) FY:2022 FundSRC:. Desc:CONTINGENCY |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 22 | 21a. Fiscal Year: | ||
22. Bid Pkg Rdy Date: | 5/20/2022 | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | |
23. Bid Adv Date: | 6/24/2022 | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Increase construction budget |
26. JUSTIFICATION |
The estimate developed for current program did not include 3 percent inflation factor for year of expenditure. ICAP is included in this request. Contingent upon PPAC approval, this will be included in the FY22-FY26 Five Year Program. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 5/5/2020 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
5/11/2020 9:09:34 AM | Pei-jung Li | (602) 712-8708 | 205 S 17th Ave, , 605E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
PRESCOTT LAKES PKWY - FRONTIER VILLAGE | WIDEN FROM 4 LANES TO 6 | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901U | 1.0 | 069-A(217)T |
16. Original Program Budget: $300,000 | 17. Original Program Item #: 100248 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$300,000 | ($300,000) (0%) | $0 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | 17-0006334-I |
$ 300 Item #:100248 (Utility Relocation) FY:2020 FundSRC:. Desc:Prescott Lakes Parkway - Frontier Village | $ -300 Item #:72320 ( ) FY:2020 FundSRC:. Desc:CONTINGENCY |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Defer Utility Phase |
26. JUSTIFICATION |
The original environmental clearance completion and Utility phase start was planned for 4Q FY20. The environmental cultural clearance delay is due to current tribes agency closure. The utility phase funding will move to a future Fiscal Year. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Delete Project. | Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 5/5/2020 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
5/11/2020 9:07:25 AM | Pei-jung Li | (602) 712-8708 | 205 S 17th Ave, , 605E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
PRESCOTT LAKES PKWY - FRONTIER VILLAGE | WIDEN FROM 4 LANES TO 6 | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901D | 1.0 | 069-A(217)T |
16. Original Program Budget: $1,000,000 | 17. Original Program Item #: 100248 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$1,000,000 | $2,471,000 (0%) | $3,471,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | 17-0006334-I |
$ 150 Item #:OTHR18 (City of Prescott) FY:0 FundSRC: Desc: | $ 471 Item #:70020 ( ) FY:2020 FundSRC:. Desc:ENGINEERING SUPPORT |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Increase design Budget |
26. JUSTIFICATION |
The original design funding did not include utility destination, utility potholing, ROW coordination, ROW appraisal, ROW title and plan preparation. Additional design funding is also required to add design topographic survey, Geotech investigation and Retaining Wall design to avoid right of way needs in Tribal land. Estimated cost is based on post-stage II design and footprint. Consultant (Retaining Wall Design, ROW Consultant, utility destination & potholing)- $351k Staff - $77k ICAP - $43k |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Request Withdrawn. Check with CYMPO for funding. |
PRB Meeting Date: 5/5/2020 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
5/12/2020 9:30:34 AM | Pei-jung Li | (602) 712-8708 | 205 S 17th Ave, , 605E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
PRESCOTT LAKES PKWY - FRONTIER VILLAGE | WIDEN FROM 4 LANES TO 6 | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901R | 1.0 | 069-A(217)T |
16. Original Program Budget: $975,000 | 17. Original Program Item #: 100248 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$975,000 | ($975,000) (0%) | $0 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | 17-0006334-I |
$ 975 Item #:100248 ( ) FY:2020 FundSRC:. Desc:Prescott Lakes Parkway - Frontier Village | $ -975 Item #:72320 ( ) FY:2020 FundSRC:. Desc:CONTINGENCY |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Defer ROW phase |
26. JUSTIFICATION |
The original environmental clearance completion and right of way phase start was planned for 4Q FY20. The environmental cultural clearance delay is due to current tribes agency closure. Right of Way will move to a future Fiscal Year. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Delete Project. | Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 5/15/2018 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
4/24/2020 9:52:25 AM | Pei-jung Li | (602) 712-8708 | 205 S 17th Ave, , 605E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
PRESCOTT LAKES PKWY - FRONTIER VILLAGE | Roadway Widening | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901D | 1.0 | 069-A(217)T |
16. Original Program Budget: $0 | 17. Original Program Item #: 100248 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$0 | $1,000,000 (0%) | $1,000,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | 17-0006334-I |
$ 150 Item #:OTHR18 (City of Prescott ) FY:0 FundSRC: Desc: |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Establish a new design project |
26. JUSTIFICATION |
The project feasibility study was completed in November of 2015. The project will involve construction of one additional lane in each direction on SR 69 from west of Prescott Lake Parkway to Frontier Village, east of Yavapai Connector. Construction project is programmed in FY21 in the Tentative Five-Year Program. The JPA was executed with Yavapai County, City of Prescott, Yavapai County Flood Control District and CYMPO. Local funds for design cost are committed in FY18. Additional design funds will be needed. The amount of additional funds will be determined once the initial design footprint is identified, utility relocation and ROW needs are evaluated and other project discovery has occurred. Consultant - $778k Staff - $130k ICAP - $92k |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Establish a New Project. | Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 11/26/2013 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
12/23/2013 2:27:37 PM | John Dickson | (602) 712-8683 | 205 S 17th Ave, 295, 614E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
Prescott Lakes Pkwy - Frontier Village | Feasibility Study | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | H873901L | 1.0 |
16. Original Program Budget: $0 | 17. Original Program Item #: |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$0 | $400,000 (0%) | $400,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 400 Item #:70014 (.) FY:0 FundSRC: Desc: |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | 2014 | ||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Establish a new Feasibility Study. |
26. JUSTIFICATION |
This study is to determine how to eliminate the bottleneck on SR 69 that occurs between the Gateway Mall area and SR 69/89. This project, in combination with the project the Yavapai Prescott Indian Tribe is constructing in the Frontier Village/ SR 89 and SR 69 interchange area, would be the final piece in eliminating that bottle neck and would increase capacity and safety. Staff - $100k Consultant - $262k ICAP - $38k |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Establish a New Project. | Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 4/23/2013 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
5/14/2013 11:39:22 AM | Bret Anderson | (602) 712-8144 | 206 S 17th Ave, 371, 310B |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
Prescott Canyon Dr - Prescott Lakes Pkwy | Scoping | QI1M | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Prescott | 69 | Yavapai | 293.8 | _ | 1 |
16. Original Program Budget: $0 | 17. Original Program Item #: |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$0 | $400,000 (0%) | $400,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 400 Item #:72313 ( ) FY:0 FundSRC: Desc: |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | 13 | ||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Establish a new Project. |
26. JUSTIFICATION |
CYMPO requested this project be Scoped in place of the 89A Fain Rd - SR-189 because it has a higher priority. The District Engineer supports CYMPO`s request. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Establish a New Project. | Item(s) Approved. Subject to PPAC Approval. |
Arizona Department of Transportation |