PRB Actions |
Return to previous page | View Schedule | PRB Decisions | Print this page |
PRB Meeting Date: 4/16/2024 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
4/19/2024 9:03:40 AM | Rashidul Haque | (602) 712-7352 | 205 S 17th Ave, 295, 614E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
COCHISE RAILROAD OVERPASS | CONSTRUCT RAILROAD OP & DRAINAGE IMPROVEMENTS | MZ1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Safford | 191 | Cochise | 62.83 | F038301D | 1.0 | 191-A(205)T |
16. Original Program Budget: $2,545,000 | 17. Original Program Item #: 101614 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$2,545,000 | $1,700,000 (0%) | $4,245,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 1320 Item #:101614 ( ) FY:0 FundSRC: Desc: | $ 1700 Item #: 72324 ( ) FY:0 FundSRC: Desc: |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Increase Budget. |
26. JUSTIFICATION |
The project team has identified a new and shorter alignment north-east of the existing bridge to construct the project within the programmed construction budget. This proposed alignment with some design exceptions, will reduce the length of the proposed Union Pacific Railroad (UPRR) bridge and avoid drainage impacts on the upstream of the Walnut Wash. This allows an in-kind replacement of the Walnut Wash box culvert. This request includes consultant efforts for additional geotechnical investigations and design revisions. The realignment of US 191 will also require additional staff coordination efforts. Consultant: $1,429K Staff: $106K ICAP: $165K |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Item(s) Approved. |
PRB Meeting Date: 2/6/2024 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
2/8/2024 9:34:06 AM | Rashidul Haque | (602) 712-7352 | 205 S 17th Ave, 295, 614E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
US 191 COCHISE RAILROAD OVERPASS | BRIDGE REPLACEMENT | MZ1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Safford | 191 | Cochise | 62.5 | F038301C | 1.0 | 191-A(205)T |
16. Original Program Budget: $41,250,000 | 17. Original Program Item #: 101614 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$41,250,000 | $0 (0%) | $41,250,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 41250 Item #:101614 ( ) FY:0 FundSRC: Desc: | $ -41250 Item #:72324 ( ) FY:2024 FundSRC:. Desc:CONTINGENCY |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 24 | 21a. Fiscal Year: | 25 | |
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 4/26/2024 | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Defer Project to FY25. |
26. JUSTIFICATION |
Based on discussions and subsequent guidance, the project team is evaluating an alternative design solution to construct the project within the programmed budget. This effort will delay the schedule and it is anticipated to be advertised in FY25. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Change in FY. | Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 1/23/2024 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
1/23/2024 11:35:23 AM | Rashidul Haque | (602) 712-7352 | 205 S 17th Ave, 295, 614E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
US 191 COCHISE RAILROAD OVERPASS | BRIDGE REPLACEMENT | MZ1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Safford | 191 | Cochise | 62.5 | F038301C | 1.0 | 191-A(205)T |
16. Original Program Budget: $41,250,000 | 17. Original Program Item #: 101614 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$41,250,000 | $0 (0%) | $41,250,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 41250 Item #:101614 ( ) FY:0 FundSRC: Desc: | $ -41250 Item #:72324 ( ) FY:2024 FundSRC:. Desc:CONTINGENCY |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 24 | 21a. Fiscal Year: | ||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 4/26/2024 | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Defer Project to FY25. |
26. JUSTIFICATION |
Based on discussions and subsequent guidance, the project team is evaluating an alternative design solution to construct the project within the programmed budget. This effort will delay the schedule and it is anticipated to be advertised in FY25. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Request Withdrawn. |
PRB Meeting Date: 10/31/2023 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
10/31/2023 9:27:45 AM | Rashidul Haque | (602) 712-7352 | 205 S 17th Ave, 295, 614E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
COCHISE RAILROAD OVERPASS | CONSTRUCT RAILROAD OP & DRAINAGE IMPROVEMENTS | MZ1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Safford | 191 | Cochise | 62.83 | F038301C | 1.0 | 191-A(205)T |
16. Original Program Budget: $41,250,000 | 17. Original Program Item #: 101614 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$41,250,000 | $16,250,000 (0%) | $57,500,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 41250 Item #:101614 ( National Freight Prog) FY:0 FundSRC: Desc: | $ 16250 Item #: 77824 (National Freight Prog) FY:0 FundSRC: Desc: |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 24 | 21a. Fiscal Year: | ||
22. Bid Pkg Rdy Date: | 12/22/2023 | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | |
23. Bid Adv Date: | 4/26/2024 | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Increase Budget. |
26. JUSTIFICATION |
Additional Construction Funding is needed for the following reasons: -Current construction program amount was based on stage II estimate prepared prior to the completion of the geotechnical investigation. To address the major settlement issues per completed geotechnical investigation at stage III,lightweight embankment fill with MSE walls(74,000 SQFT) is required throughout the project. -The post stage IV(current) construction estimate also reflects current market price. ICAP is included in the request. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Request Withdrawn. |
PRB Meeting Date: 4/11/2023 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
4/13/2023 8:40:14 AM | Rashidul Haque | (602) 712-7352 | 205 S 17th Ave, 295, 614E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
COCHISE RAILROAD OVERPASS | CONSTRUCT RAILROAD OP & DRAINAGE IMPROVEMENTS | MZ1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Safford | 191 | Cochise | 62.83 | F038301R | 1.0 | 191-A(205)T |
16. Original Program Budget: $0 | 17. Original Program Item #: 101614 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$0 | $150,000 (0%) | $150,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 150 Item #: 71023 (National Freight Prog) FY:0 FundSRC: Desc: |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Establish Right of Way Subphase. |
26. JUSTIFICATION |
Funding is required for right of way acquisition/easement from the Arizona State Land, Union Pacific Railroad and privately owned parcels. Acquisition: $135K ICAP: $15k |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Establish a New Project. | Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 4/11/2023 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
4/13/2023 8:39:31 AM | Rashidul Haque | (602) 712-7352 | 205 S 17th Ave, 295, 614E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
COCHISE RAILROAD OVERPASS | CONSTRUCT RAILROAD OP & DRAINAGE IMPROVEMENTS | MZ1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Safford | 191 | Cochise | 62.83 | F038301D | 1.0 | 191-A(205)T |
16. Original Program Budget: $1,620,000 | 17. Original Program Item #: 101614 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$1,620,000 | $925,000 (0%) | $2,545,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 1320 Item #:101614 ( ) FY:0 FundSRC: Desc: | $ 925 Item #: 72323 (National Freight Prog) FY:0 FundSRC: Desc: |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Increase Budget. |
26. JUSTIFICATION |
Additional design funding is needed for the reasons: - Per previous study, a box culvert was anticipated at Walnut Wash. After completing the scoping and geotechnical investigation it was determined that a bridge and lightweight embankment fill with MSE walls is required due to major settlement issues. - To comply with the Union Pacific Railroad`s requirements, a longer span bridge is required over the railroad. - Maintenance access routes will be needed from US 191 for the railroad which were identified during scoping. - Realignment of US 191 is necessary for the project site conditions which have required additional coordination efforts by ADOT Utility-Railroad and Right of Way ADOT/consultant staff. Consultant: $650K Staff: $187K ICAP: $88K |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 4/11/2023 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
4/13/2023 8:40:37 AM | Rashidul Haque | (602) 712-7352 | 205 S 17th Ave, 295, 614E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
COCHISE RAILROAD OVERPASS | CONSTRUCT RAILROAD OP & DRAINAGE IMPROVEMENTS | MZ1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Safford | 191 | Cochise | 62.83 | F038301U | 1.0 | 191-A(205)T |
16. Original Program Budget: $0 | 17. Original Program Item #: 101614 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$0 | $360,000 (0%) | $360,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 360 Item #: 71023 (National Freight Prog) FY:0 FundSRC: Desc: |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Establish Utility Subphase. |
26. JUSTIFICATION |
Funding is required for: - Union Pacific Railroad Construction and Management (C&M) agreement. - Prior Rights relocation of Sulphur Springs Valley Electric overhead powerline. - Prior Rights relocation of Lumen/Centurylink underground telephone cable. Utility Agreements: $326k ICAP: $34k |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Establish a New Project. | Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 9/13/2022 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
9/16/2022 3:21:59 PM | Rashidul Haque | (602) 712-7352 | 205 S 17th Ave, 295, 614E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
COCHISE RAILROAD OVERPASS | CONSTRUCT RAILROAD OP & DRAINAGE IMPROVEMENTS | MZ1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Safford | 191 | Cochise | 62.83 | F038301D | 1.0 | 191-A(205)T |
16. Original Program Budget: $1,620,000 | 17. Original Program Item #: 101614 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$1,620,000 | $500,000 (0%) | $2,120,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 1320 Item #:101614 ( ) FY:0 FundSRC: Desc: | $ 500 Item #: 72323 ( ) FY:0 FundSRC: Desc: |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Increase Budget. |
26. JUSTIFICATION |
Additional design funding is needed for the following reasons: Instead of a box culvert, a bridge was recommended over Walnut Wash to address major settlement issue. To comply with the Union Pacific Railroad`s requirement, design of a longer span bridge over the railroad is needed. Additionally,it has been determined that maintenance access routes will be needed from US 191 to the railroad. Based on stage II plans , ADOT Utility & Railroad and Right of Way sections have requested additional staff hours for coordination. Consultant: $377K Staff: $75K ICAP: $48K |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Request Withdrawn. |
PRB Meeting Date: 3/2/2021 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
3/4/2021 8:12:50 AM | Rashidul Haque | (602) 712-7352 | 205 S 17th Ave, 295, 614E |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
COCHISE RAILROAD OVERPASS | CONSTRUCT RAILROAD OP & DRAINAGE IMPROVEMENTS | MZ1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Safford | 191 | Cochise | 62.83 | F038301D | 1.0 | 191-A(205)T |
16. Original Program Budget: $1,320,000 | 17. Original Program Item #: 101614 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$1,320,000 | $300,000 (0%) | $1,620,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 1320 Item #:101614 ( ) FY:0 FundSRC: Desc: | $ 300 Item #: 100277 (Statewide Truck Parking & Freight Operations - Design / Construct Truck Parking Statewide FY22) FY:0 FundSRC: Desc: |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Establish New Project |
26. JUSTIFICATION |
A Design Concept Report(DCR) was completed in 2001. An oversize load study was also completed in 2013 by ADOT MPD. In accordance with the DCR and load study, the 28 ft. wide Cochise railroad overpass needs to be replaced with a 44ft. wide overpass, along with realigning the approaches and other drainage improvements. Consultant: $1,200K Staff: $274K ICAP: $146K |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Establish a New Project. | Item(s) Approved. |
Arizona Department of Transportation |