PRB Actions |
Return to previous page | View Schedule | PRB Decisions | Print this page |
PRB Meeting Date: 2/28/2023 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
3/1/2023 3:11:38 PM | Rehnuma Rahman | (602) 712-7342 | 205 S 17th Ave, Next, O68R |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
SR 87 @ KENWORTHY RD & SR 287 @ CHRISTENSEN RD | CONSTRUCT TURN LANES | CL1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Tucson | 87 | Pinal | 135 | F037301C | 0 | HSIP087-A(213)T |
16. Original Program Budget: $1,138,000 | 17. Original Program Item #: 101003 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$1,138,000 | $160,000 (0%) | $1,298,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 1073 Item #: 101003 (94.3pct Federal HSIP) FY:0 FundSRC: Desc: | $ 151 Item #:70123 ( 94.3pct Federal HSIP) FY:2023 FundSRC:. Desc:MODERNIZATION |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 23 | 21a. Fiscal Year: | ||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 4/28/2023 | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Increase Budget. |
26. JUSTIFICATION |
The additional funding is required as the project construction cost was estimated prior to Stage IV in April, 2022 and the construction materials cost have increased since that time. The cost of both temporary traffic control and permanent regulatory signs, as well as the unit price of asphalt materials, binders, pavement marking, mobilization and seeding are the most notable increases for this project. ICAP is included in this request. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Item(s) Approved. |
PRB Meeting Date: 10/18/2022 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
10/20/2022 2:29:42 PM | Rehnuma Rahman | (602) 712-7342 | 205 S 17th Ave, Next, O68R |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
SR 87 @ KENWORTHY RD & SR 287 @ CHRISTENSEN RD | CONSTRUCT TURN LANES | CL1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Tucson | 87 | Pinal | 135 | F037301C | 0 | 087-A(213)T |
16. Original Program Budget: $1,138,000 | 17. Original Program Item #: 101003 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$1,138,000 | $0 (0%) | $1,138,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 1073 Item #: 101003 (94.3pct Federal HSIP) FY:0 FundSRC: Desc: |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 23 | 21a. Fiscal Year: | ||
22. Bid Pkg Rdy Date: | 12/23/2022 | 22a. Bid Pkg Rdy Date: | 4/28/2023 | 24. Verified all of the new funding sources |
23. Bid Adv Date: | 12/23/2022 | 23a. Bid Adv Date: | 4/28/2023 |
25. DESCRIPTION OF REQUEST |
Move project to Q4 of FY 23. |
26. JUSTIFICATION |
Due to the time required for the environmental consultant to complete the cultural testing, the project team is recommending to defer the project to Quarter 4 of Fiscal Year 2023. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Change in Schedule. | Item(s) Approved. |
PRB Meeting Date: 7/12/2022 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
7/15/2022 8:39:40 AM | Rehnuma Rahman | (602) 712-7342 | 205 S 17th Ave, Next, O68R |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
SR-87 - KENWORTHY RD & SR-287 @ CHRISTENSEN RD | CONSTRUCT TURN LANES | CL1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Tucson | 87 | Pinal | 133.0 | F037301C | 0.1 | HSIP087-A(213)T |
16. Original Program Budget: $1,138,000 | 17. Original Program Item #: 101003 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$1,138,000 | $0 (0%) | $1,138,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 1138 Item #: 101003 ( ) FY:0 FundSRC: Desc: |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 23 | 21a. Fiscal Year: | ||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 12/23/2022 | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Update Beginning Milepost |
26. JUSTIFICATION |
Based on field visits and input from the team during the design, the beginning project termini should be updated to MP 135. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Item(s) Approved. |
PRB Meeting Date: 4/26/2022 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
4/28/2022 2:14:36 PM | Rehnuma Rahman | (602) 712-7342 | 205 S 17th Ave, Next, O68R |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
SR 87 @ KENWORTHY RD & SR-287 @ CHRISTENSEN RD | CONSTRUCT TURN LANES | CL1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Tucson | 87 | Pinal | 133.0 | F037301R | 0.0 | HSIP087-A(213)T |
16. Original Program Budget: $4,000 | 17. Original Program Item #: 101003 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$4,000 | ($4,000) (0%) | $0 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 4 Item #:70122 ( ) FY:2022 FundSRC:. Desc:MODERNIZATION | $ -4 Item #:70122 (TCE acquisition) FY:2022 FundSRC:. Desc:MODERNIZATION |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Delete subphase. |
26. JUSTIFICATION |
Property acquisition will be through resolution with the City of Coolidge without any acquisition fee. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Delete Project. | Item(s) Approved. |
PRB Meeting Date: 4/12/2022 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
6/6/2022 2:01:42 PM | Rehnuma Rahman | (602) 712-7342 | 205 S 17th Ave, Next, O68R |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
SR-87 - KENWORTHY RD & SR-287 @ CHRISTENSEN RD | CONSTRUCT TURN LANES | CL1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Tucson | 87 | Pinal | 133.0 | F037301C | 0.0 | HSIP087-A(213)T |
16. Original Program Budget: $883,000 | 17. Original Program Item #: 101003 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$883,000 | $255,000 (0%) | $1,138,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 883 Item #: 101003 (SR-87 - Kenworthy Rd & SR-287 at Christensen Rd - Construct Turn Lanes) FY:0 FundSRC: Desc: | $ -883 Item #:70122 (.) FY:2022 FundSRC:. Desc:MODERNIZATION |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 22 | 21a. Fiscal Year: | 23 | |
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 4/15/2022 | 23a. Bid Adv Date: | 12/23/2022 |
25. DESCRIPTION OF REQUEST |
Defer Project to FY23 Increase Budget |
26. JUSTIFICATION |
Due to the time required to complete the cultural investigation for the construction, the project team is recommending the project advertisement be deferred to FY 23. The initial construction cost estimation was based on pre-scoping level. After the Stage III submission, the construction cost increased due to Specialty Signs, Barricades, Portable Sign Stands, Warning Lights, Traffic Cones, Embedded Sign Posts, TMAs and Temporary Signs not being itemized in the traffic control estimate, prior to Stage III, since traffic control was based on a lump sum of 4pct of initial roadway cost. The Pavement Markings, Pavement Legends, Pavement Symbols, Slip Bases, Sign Posts, Sign Panels and Object Markers were not itemized prior to Stage III in the signing and striping estimate, since signing and striping was based on a lump sum of 4pct of initial roadway cost. In addition, the below the line items of CE cost, post design were estimated too low. ICAP is included in this request. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Change in FY. Change in Schedule. | Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 1/25/2022 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
1/27/2022 10:02:32 AM | Rehnuma Rahman | (602) 712-7342 | 205 S 17th Ave, Next, O68R |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
SR 87 @ KENWORTHY RD & SR 287 @ CHRISTENSEN RD | CONSTRUCT TURN LANES | CL1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Tucson | 87 | Pinal | 133 | F037301D | 0 | 087-A(213)T |
16. Original Program Budget: $340,000 | 17. Original Program Item #: 101003 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$340,000 | $197,000 (0%) | $537,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 250 Item #: 101003 (SR-87 - Kenworthy Rd & SR-287 at Christensen Rd ) FY:0 FundSRC: Desc: | $ 197 Item #:70122 (Environmental cultural testing) FY:2022 FundSRC:. Desc:MODERNIZATION |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Increase budget. |
26. JUSTIFICATION |
Based on the cultural resources inventory and ADOT Historic Preservation Team (HPT) findings, Phase I testing is required at SR87 and Kenworthy Rd. Consultant: $177K ICAP: $20K |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Item(s) Approved. |
PRB Meeting Date: 8/17/2021 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
8/19/2021 11:53:00 AM | Rehnuma Rahman | (602) 712-7342 | 205 S 17th Ave, Next, O68R |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
SR-87 - KENWORTHY RD & SR-287 @ CHRISTENSEN RD | CONSTRUCT TURN LANES | CL1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Tucson | 87 | Pinal | 133.0 | F037301C | 0.0 | HSIP087-A(213)T |
16. Original Program Budget: $883,000 | 17. Original Program Item #: 101003 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$883,000 | $0 (0%) | $883,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 883 Item #:10100 ( ) FY:0 FundSRC: Desc: | $ -883 Item #:70122 (.) FY:2022 FundSRC:. Desc:MODERNIZATION |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 22 | 21a. Fiscal Year: | 23 | |
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 4/15/2022 | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Defer Project |
26. JUSTIFICATION |
Due to the time required to complete the Environmental investigation and secure the necessary TCE, project team is recommending the project advertisement be deferred to FY 23. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Change in FY. | Request Withdrawn. Will reassess once the Cultural Survey is completed. |
PRB Meeting Date: 8/17/2021 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
8/19/2021 11:51:11 AM | Rehnuma Rahman | (602) 712-7342 | 205 S 17th Ave, Next, O68R |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
SR 87 @ KENWORTHY RD & SR 287 @ CHRISTENSEN RD | CONSTRUCT TURN LANES | CL1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Tucson | 87 | Pinal | 133 | F037301D | 0 | 087-A(213)T |
16. Original Program Budget: $250,000 | 17. Original Program Item #: 101003 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$250,000 | $90,000 (0%) | $340,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 250 Item #:10100 ( ) FY:0 FundSRC: Desc: | $ 90 Item #:70122 (Environmental survey, TCE and SUE) FY:2022 FundSRC:. Desc:MODERNIZATION |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Increase budget. |
26. JUSTIFICATION |
Cultural survey is required for the entire project footprint. The survey will be completed by a consultant. Additionally, a TCE is required at the intersection of SR 87 and Kenworthy Rd to provide access for construction equipment. Funding is required for staff to complete the TCE acquisition. Funding is also needed for SUE (Phase II) activity. Staff: $27K Consultant: $54K ICAP: $9K |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Item(s) Approved. |
PRB Meeting Date: 8/17/2021 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
8/19/2021 11:52:20 AM | Rehnuma Rahman | (602) 712-7342 | 205 S 17th Ave, Next, O68R |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
SR 87 @ KENWORTHY RD & SR-287 @ CHRISTENSEN RD | CONSTRUCT TURN LANES | CL1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Tucson | 87 | Pinal | 133.0 | F037301R | 0.0 | HSIP087-A(213)T |
16. Original Program Budget: $0 | 17. Original Program Item #: 101003 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$0 | $4,000 (0%) | $4,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 4 Item #:70122 (TCE acquisition) FY:2022 FundSRC:. Desc:MODERNIZATION |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Establish new subphase. |
26. JUSTIFICATION |
Property acquisition is required for TCE at the intersection of SR 87 and Kenworthy Road to provide access for construction equipment. Acquisition: $3K ICAP: $1K |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Establish a New Project. | Item(s) Approved. |
PRB Meeting Date: 4/6/2021 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
6/4/2021 9:14:37 AM | Rehnuma Rahman | (602) 712-7382 | 1221 N 21st Ave, Next, O68R |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
SR-87 - KENWORTHY RD & SR-287 @ CHRISTENSEN RD | CONSTRUCT TURN LANES | CL1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Tucson | 87 | Pinal | 133.0 | F037301C | 0.0 | HSIP087-A(213)T |
16. Original Program Budget: $463,000 | 17. Original Program Item #: 101003 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$463,000 | $420,000 (0%) | $883,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 463 Item #: 101003 (SR-87 - Kenworthy Rd & SR-287 at Christensen Rd - Construct Turn Lanes ) FY:0 FundSRC: Desc: | $ 420 Item #:70122 (.) FY:2022 FundSRC:. Desc:MODERNIZATION |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 22 | 21a. Fiscal Year: | ||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 4/15/2022 | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Increase budget. |
26. JUSTIFICATION |
When this HSIP project was initially programmed, the cost estimate did not employ an itemized cost breakdown. That estimate was developed using a unit cost per intersection model, which did not reflect actual project costs. A updated estimate was developed, using an itemized cost breakdown, which reflects actual project costs. ICAP is included in this request. Contingent upon PPAC approval, this will be included in the FY22-FY26 Five Year Program. |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Item(s) Approved. Subject to PPAC Approval. |
PRB Meeting Date: 9/29/2020 | |||
Request Teleconference | Teleconference Phone #: | ||
Video Teleconference | |||
2. Form Date: | 3. Project Manager/Presenter: | 4. Phone Number(s): | 5. Mail Drop: |
1/13/2021 7:50:24 AM | Rehnuma Rahman | (602) 712-7382 | 1221 N 21st Ave, Next, O68R |
6. Project Name/Location: | 7. Type of Work: | 8. CPS Id: | ||||
SR 87 @ N. KENWORTHY RD & SR 287 @ N. CHRISTENSEN RD | CONSTRUCT TURN LANES | CL1P | ||||
9. District: | 10. Route: | 11. County: | 12. Beg. MP: | 13. TRACS #: | 14. Len. (mi): | 15. Fed ID#: |
Tucson | 87 | Pinal | 133 | F037301D | 0 | 087-A(213)T |
16. Original Program Budget: $232,000 | 17. Original Program Item #: 101003 |
Project Budget | Project Budget | Project Budget |
18. Current Approved: | 18a. New Project/Change Request: | 18b. Final: |
$232,000 | $18,000 (0%) | $250,000 |
Funding Source(s) | Funding Source(s) | 20. JPA #, Signed, Adot Adv.: |
19. Current Approved: | 19a. New Project/Change Request: | |
$ 232 Item #: 101003 (SR-87 - Kenworthy Rd & SR-287 at Christensen Rd - Design Turn Lanes) FY:0 FundSRC: Desc: | $ 18 Item #:70121 (.) FY:2021 FundSRC:. Desc:MODERNIZATION |
Current Approved | New Project/Change Request | |||
21. Fiscal Year: | 21a. Fiscal Year: | |||
22. Bid Pkg Rdy Date: | 22a. Bid Pkg Rdy Date: | 24. Verified all of the new funding sources | ||
23. Bid Adv Date: | 23a. Bid Adv Date: |
25. DESCRIPTION OF REQUEST |
Establish New Project. |
26. JUSTIFICATION |
Installing turn lanes for intersection safety countermeasures. The project is included in the Highway Safety Improvement Program (HSIP). Staff: $197.5K Consultant: $30K ICAP: $22.5K |
27. CONCERNS OF THE PROJECT TEAM REGARDING THE REQUEST |
28. OTHER ALTERNATIVES CONSIDERED |
REQUESTED ACTIONS | APPROVED/RECOMMENDED ACTIONS |
Establish a New Project. | Item(s) Approved. |
Arizona Department of Transportation |