Project Detail
0000 MA GIL T033601C GIL-0-(218)T TOWN OF GILBERT (Mews Rd beginning at Higley Rd)
Central DistrictItem # 102465
Engineering Specialist: Jalal Kamal
Pre-Qualification: YES
Bid Opening: 10/17/2025 11:00:00 AM
System Enhancement (Engineering)
The proposed project is located in Maricopa County, within the Town of Gilbert, for the half-mile of Mews Road east of Higley Road. The project work includes paving gravel roadway, construction of a concrete drainage channel on the south side of Mews Road, and waterline and sewer line extensions and other related work.
Plans |
Cost |
Bid Set | $1.00 |
Spec Set | N/A |
Earth Work | N/A |
Cross Section | N/A |