Project Detail

303 MA 099 H687001C 303-A-(219)T BOB STUMP MEMORIAL PARKWAY (303 MC 85 - Van Buren St)
Central DistrictItem # 8899
Engineering Specialist: Mahdi Ghalib
Pre-Qualification: YES
Bid Opening: 12/12/2025 11:00:00 AM

New Facilities (Construction of New Roads)

The proposed project is located in Maricopa County within the City of Goodyear from MC 85 to Van Buren Street between Milepost 99.14 and Milepost 103.23. The work consists of constructing new freeway from MC85 to the existing termini at Van Buren. The work includes excavation, embankment, concrete and asphaltic concrete paving, nine new concrete bridges, retaining walls, sound walls, storm drain, catch basins, reinforced concrete box culverts, concrete channels, landscaping, erosion control, pavement markings, signing, traffic signals, lighting, FMS, and other related work.
Plans Cost
Bid Set$1.00
Spec SetN/A
Earth WorkN/A
Cross SectionN/A

Last Updated 7/17/2025 2:57 PM