As-Read Bid Results
070 GH 335 F064701C 070-A-(225)T GLOBE-LORDSBURG HWY (US 70) (Reay Ln to 8th St)
SouthEast DistrictItem # 103723
Engineering Specialist: Vian Rashid
Pre-Qualification: YES
Bid Opening: 6/6/2025 11:00:00 AM
The proposed project is located in Graham County along US 70 through the Town of Thatcher and the City of Safford (MP 335.63 to 340.10) from Reay Lane to 8th Street. The work consists of pavement rehabilitation and pedestrian facilities improvements. The work also includes milling and replacement of asphaltic concrete, signing, pavement marking, and the repair of the crack in the box culvert at (MP 337.137), and other related work.
Bid Amount |
Contractor Name |
Contractor Address |
$10,568,495.40
|
DEPARTMENT |
PHOENIX, AZ |
$9,594,288.00
|
SUNLAND ASPHALT & CONSTRUCTION LLC |
PHOENIX, AZ |
$10,324,092.00
|
FNF CONSTRUCTION, INC. |
TEMPE, AZ |
$10,387,777.77
|
FANN CONTRACTING, INC |
PRESCOTT, AZ |
$10,774,580.60
|
W. W. CLYDE & CO. |
Orem, UT |
$11,160,881.00
|
GRANITE CONSTRUCTION COMPANY |
TUCSON, AZ |