As-Read Bid Results
160 AP 420 H891301C 160-B-(205)T TUBA CITY - FOUR CORNERS HIGHWAY (US 160) (LAGUNA CREEK BRIDGE #20001)
NorthEast DistrictItem # 6393
Engineering Specialist: Patton Samuel James
Pre-Qualification: YES
Bid Opening: 2/10/2017 11:00:00 AM
The proposed work is located in Apache County on US Route 160 between mile post 420.00 and 420.27. Laguna Creek Bridge is within the boundaries of the Navajo Nation Reservation and approximately 20 miles west of the Town of Mexican Water. The proposed work consists of gabion basket bank protection and other related work.
Bid Amount |
Contractor Name |
Contractor Address |
$598,479.05
|
DEPARTMENT |
PHOENIX, AZ |
$619,699.00
|
RUMMEL CONSTRUCTION, INC |
SCOTTSDALE, AZ |
$682,785.04
|
N.G.U CONTRACTING, INC. |
PAYSON, AZ |
$631,825.21
|
Hatch Construction |
TAYLOR, AZ |
$729,778.81
|
SHOW LOW CONSTRUCTION, INC. |
SHOW LOW, AZ |
$732,277.78
|
FNF CONSTRUCTION, INC. |
TEMPE, AZ |
$8,035,554.40
|
FANN CONTRACTING, INC |
PRESCOTT, AZ |
$814,000.00
|
K.A.Z. CONSTRUCTION, INC. |
TUCSON, AZ |