As-Read Bid Results

089 YV 258 H813601C STP-089-A(209)T WICKENBURG - PRESCOTT (SR 89) (JCT US 93 TO JCT SR 71)
NorthWest DistrictItem # 14415
Engineering Specialist: Jafari Reza
Pre-Qualification: YES
Bid Opening: 12/9/2016 11:00:00 AM

SYSTEM PRESERVATION-RESTORATION/REHAB/RESURFACE

The proposed work is located The proposed project is located in Yavapai County. This pavement preservation project begins at MP 258.16 and ending at MP 268.32 on State Route (SR) 89 southeast of the community of Congress. The work consists of Milling and replacing the full width of SR 89 with asphaltic concrete (AC) and an asphalt rubber-AC friction course (extend pavement work on SR 71 - milled and repaved 10' back on east side from the crossing by full width), Replacing ground-in rumble strips in the new pavement at locations where they currently exist, shoulder build-up with milled AC, Removing and replacing the full depth of the damaged pavement at MP 267.7 5, Installing object markers on the concrete box culvert at MP 261.3 , Installing traffic loop detectors at MP 262.8 and MP 267.0, Replacing signs and reflectors, and other related work.
Bid Amount Contractor Name Contractor Address
$3,025,720.00 DEPARTMENT PHOENIX, AZ
$2,651,505.61 FNF CONSTRUCTION, INC. TEMPE, AZ
$2,656,448.88 FANN CONTRACTING, INC PRESCOTT, AZ
$2,791,970.00 SUNLAND, INC. ASPHALT & SEAL COATING TEMPE, AZ
$2,857,594.41 COMBS CONSTRUCTION COMPANY, INC. GLENDALE, AZ
$3,081,689.60 N.G.U CONTRACTING, INC. PAYSON, AZ
$3,407,707.80 ASPHALT PAVING & SUPPLY, INC. PRESCOTT VALLEY, AZ

Last Updated 5/28/2026 9:42 AM